Read Full Story — Construction
A firm operating in office and mixed-use projects worked to conventional building standards; sustainability certification had never been a priority.
As corporate tenants began looking for green building certification as a leasing criterion, the firm's inexperience in this area risked becoming a competitive disadvantage. The certification process was seen as both complex and an uncertain cost increase; this uncertainty kept delaying management from taking the first step.
A three-phase approach limited risk by proceeding through a single, well-chosen pilot:
Rather than applying it to all new projects at once, a single project still at the planning stage was chosen as the pilot; this kept risk and learning cost contained.
Working with a sustainability consultant, the firm identified which certification criteria could be met at relatively low additional cost; the approach targeted the most efficient points rather than every point.
To keep certification requirements from remaining abstract standards, teams were shown, with concrete examples, how these requirements translated into everyday decisions such as material selection and site waste management.
After fifteen months, the pilot project achieved its targeted certification level. The cost and time data gathered from the process made the certification decision far more predictable for subsequent projects.
Green building certification looks daunting when treated as an obligation to be applied across the whole portfolio at once. A single, well-chosen pilot both limits risk and generates real cost and process data for future decisions.